From B&G page
The physical plant was recently upgraded as the result of two Capital Campaigns which included new roofs over the nave, the education wing and the rectory. New energy efficient boilers were installed in the basement of the education wing (to provide separate heating for the education wing and the nave) and also a new boiler for the rectory. An on site water well was retired in favor of public water. Additional improvements to the education wing included new windows and replacement of the fixtures in the kitchen. The major focus of the second campaign was a new parking lot and driveways. This included installation of drainage, curbing, signage, striping and lighting.